The hazard analysis and the prerequisites, with their approved version and signature.
| Step | Limit | Version | Type |
|---|---|---|---|
| Goods in | ≤ 4 °C | v4 | CCP |
| Chilling | ≤ −18 °C | v4 | CCP |
| Baking | ≥ 75 °C | v4 | Prerequisite |
A plan without versions proves nothing: you must be able to say which one ruled that day.
The plan is the document holding everything else up: the hazard analysis, the critical points with their limits and the usual prerequisites, from water to training.
It is approved by versions, with its fingerprint and its signature, so that in two years you can say which plan was in force the day something happened.
What went out of limits, what was done about it and who closed it. With the audits alongside.
See the featureOne button, and the inspector sees what they ask for without you opening the rest of the business.
See the featureAllergens, labels and use-by dates; and which batch each item came from the day it has to be recalled.
See the featureYou do not have to switch everything on. Tell us how you work and we will tell you where to start. ATAZEL is in testing: write to [email protected].